Job Shop Material Control Based on the Principles of Quick Response Manufacturing

  • C.S. Bong
  • K.E. Chong
  • W.C. How

Abstract


Today cutting-edge companies will capitalize on time as a key driver of competitive advantage. Although the Paired-cell Overlapping Loops of Cards with Authorization (POLCA) of Quick Response Manufacturing (QRM) is universally adopted as a material control mechanism in the shop floor, this paper is exploring its other principle. The newly thought approach, Utilization Based (UB) system is driving a whole new ways of controlling material flow in the production with the emphasis on operate the factory at optimum machine utilization. A simulation study was conducted to compare the POLCA and UB system. The deterministic metrics such as Manufacturing Critical-path Time (MCT), Throughputs (TP), Work in Progress (WIP) show that UB system is a viable alternative especially in the job shop environment with process layout. However, this method involves subcontracting in order to maximize output and minimize waiting time. The simulation study fulfilled the objectives of evaluating two different systems using the same set of inputs. The related performance measures prove the UB approach is as feasible as POLCA adopted in the job shop environment with some outperforming results.

Downloads

Download data is not yet available.

References

B. Franklin. (2016). Founders – Advice to a Young Tradesman [Online]. Available: http://founders.archives.gov/documents/Franklin/01-03-02-0130.

G. Jr. Stalk, “Time-the next source of competitive advantage,” Harvard Business Review, vol. 41-51, 1988.

M.G. Filho and E.V. Saes, “From time-based competition (TBC) to quick response manufacturing (QRM): the evolution of research aimed at lead time reduction”, International Journal of Advanced Manufacturing Technology, vol. 64, no. 5, pp. 1177-1191, 2013.

R. Suri, Quick Response Manufacturing: A Company-wide Approach to Reducing Lead Time. New York: Productivity Press, 1998.

M.G. Filho and F.C.F. Fernandes, “Strategic paradigms for manufacturing management (SPMM): Key elements and conceptual model”, International Journal of Industrial Engineering, vol. 16, no. 2, pp. 147-159, 2009.

A.N. Nambiar, “Modern manufacturing paradigms – A comparison”, in the Proceedings of the International Multi-Conference of Engineers and Computer Scientists, Hong Kong, 2010, vol. 3, pp. 17-29.

T. Frazee and C. Standridge, “CONWIP versus POLCA: A comparative analysis in a high-mix, low-volume (HMLV) manufacturing environment with batch processing,” Journal of Industrial Engineering and Management, vol. 9, no. 2, pp. 432-449, 2016.

A. Famoush and M. Wiktorsson, “POLCA and CONWIP performance in a divergent production line: an automotive case study”, Journal of Management Control, vol. 24, no. 2, pp. 159-186, 2013.

N.O. Fernandes and S.D. Carmo-Silvo, “Generic POLCA – A production and material flow control mechanism for quick response manufacturing,” International Journal of Production Economics, vol. 104, no. 1, pp. 74-84, 2006.

V. Bhatewara, “Analysis of POLCA and GPOLCA material control strategies,” M.S. thesis, Department of Mechanical Engineering, Pune University, Pune, Maharashtra, 2010.

N. Vandale, I.V. Nieuwenhuyse, D. Claerhout and R. Cremmery, “Load-based POLCA: An integrated material control system for multiproduct, multimachine job shops”, Manufacturing and Service Operations Management, vol. 10, no. 2, pp. 181-197, 2008.

W.J. Hopp and M.L. Spearman, “To pull or not to pull: What is the question?”, Manufacturing and Service Operations Management, vol. 6, no. 2, pp. 133-148, 2004.

J. Riezebos, “Design of POLCA material control system”, International Journal of Production Research, vol. 48, no. 5, pp. 1455-1477, 2008.

R. Germs and J. Riezebos, “Workload balancing capability of pull systems in MTO production”, International Journal of Production Research, vol. 48, no. 8, pp. 2345-2360, 2010.

L. Harding, “QRM – An enabler on the road to agility? Quick response manufacturing – Part 1”, Control, vol. 20-22, 2002.

L. Harding, “QRM – An enabler on the road to agility? Quick response manufacturing – Part 2,” Control, vol. 15-16, 2002.

M.J. Land and G.J.C. Gaalman, “The performance of workload control concepts in job shops: Improving the release method”, International Journal of Operations and Production Economics, vol. 56, pp. 347-364, 1998.

R. Suri, It’s About Time: The Competitive Advantage of Quick Response Manufacturing. Portland: Productivity Press, 2016.

R. Suri, MCT: Quick Reference Guide. Wisconsin: C&M Printing Inc., 2014.

B.W. Mazziotti and Jr. R.E. Home, “Creating a flexible, simulation-based finite scheduling tools”, Proceedings of the 1997 Winter Simulation Conference, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, 1997, pp. 853-858.

A.S. Kiran, Simulation and Scheduling, Handbook of Simulation: Principles, Methodology, Advances, Applications and Practice, New York: John Wiley & Sons, Inc., 1998, pp. 677-717.

W.J. Hopp and M.L. Spearman, Factory Physics, Waveland Press, 2011.

K.E. Chong, W.C. How and C.S. Bong, “Paired-cell overlapping loops of cards with authorization simulation in job shop environment”, International Journal of Mechanical and Mechatronics Engineering, vol. 15, no. 3, pp. 68-73, 2015.

W.J. Hopp and M.L. Spearman, Factory Physics: Foundation of Manufacturing Management. Chicago: Irwin, 1996.

How to Cite
Bong, C., Chong, K., & How, W. (1). Job Shop Material Control Based on the Principles of Quick Response Manufacturing. Journal of Advanced Manufacturing Technology (JAMT), 12(1(2), 15-30. Retrieved from https://jamt.utem.edu.my/jamt/article/view/4266
Section
Articles