Y. S., and Tay, C. C., P. A. T. (2014) “INTERRELATIONSHIP BETWEEN AVAILABILITY WITH PLANNING FACTOR AND MEAN TIME BETWEEN FAILURES (MTBF) IN OVERALL EQUIPMENT EFFECTIVENESS (OEE)”, Journal of Advanced Manufacturing Technology (JAMT), 6(2). Available at: https://jamt.utem.edu.my/jamt/article/view/20 (Accessed: 24November2024).